Cableway - modification – procedure according to nature conservation legislation See explanation of the designation of:
Conditions
Description
Information on nature conservation legislation regarding the modification of cableways.
General information Explanation of this section
Outside built-up areas, the construction of cableways requires authorisation under nature conservation law (Section 6, point c of the Tyrolean Nature Conservation Act 2005 [TNSchG 2005]).
The modification of a cableway installation only requires authorisation under nature conservation law if nature conservation interests are affected under the meaning of Section 1(1) (Section 6, point f TNSchG 2005).
Requirements Explanation of this section
- No (further) damage to nature conservation interests; or
- If there is damage: the existence of another overriding public interest and no alternative option (Section 29(2) and (4)).
Deadlines Explanation of this section
None. The project may not be started until a legally binding authorisation has been issued.
The authority must issue a decision on a complete application without undue delay, and in any case within 6 months.
Procedure Explanation of this section
Written application – check of completeness of documents – investigation procedure (expert’s report, on-site inspection, discussion if necessary) – decision.
Required documents Explanation of this section
In duplicate:
- written application;
- project description (project type, location and scope);
- project appendices required for assessment of the admissibility of the project, in particular with regard to possible damage to the landscape, the recreational value of the landscape and the ecosystem (plans, sketches, descriptions, any plant and wildlife surveys, etc.);
- information on alternative solutions;
- information on the public interests regarding the project;
- proof of ownership of the land or submission of declarations of consent from affected landowners.
Costs Explanation of this section
- Administrative charge: if authorisation approved: EUR 220 or EUR 870; if rejected: nothing;
- Fees: application fee: EUR 14.30; appendices: EUR 3.90, max. EUR 21.80 per appendix; commission fees where applicable;
Responsibilities
Competent authority Explanation of this section
- Tyrolean state government, Abteilung Umweltschutz
Go to form Explanation of this section
Details
Authentification and signature
The application does not have to be signed electronically – using a mobile phone signature (Handy-Signatur) or E-ID – or by hand.
Additional information Explanation of this section
Nature conservation authorisation is only required for projects that are not subject to the Provincial Rural Road and Cableway Act (Güter- und Seilwege-Landesgesetz, Provincial Law Gazette (LGBl.) No 40/1970), and only if the project does not require nature conservation authorisation under another provision of this Act, a regulation under this Act or one of the acts or laws specified in the annex to Section 48(1).
Legal basis Explanation of this section
Tyrolean Conservation Act 2005 (Tiroler Naturschutzgesetz 2005)
https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=LrT&Gesetzesnummer=20000252
Provincial Administrative Charges Regulation (Landes-Verwaltungsabgabenverordnung) 2007:
https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=LrT&Gesetzesnummer=20000248
Fees Act (Gebührengesetz):
https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=10003882
General Administrative Procedure Act (Allgemeines Verwaltungsverfahrensgesetz) 1992
https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=10005768
Legal remedies
Appeals against decisions of the competent authority may be lodged with the Provincial Administrative Court (Landesverwaltungsgericht). The appeal must specify the contested decision and the authority that issued it. It must contain a request and set out the grounds on which the allegation of illegality is based. The appeal must be submitted in writing to the authority that issued the decision within 4 weeks of notification of this decision, and must contain information that makes it possible to assess its timeliness. The authority may issue a preliminary appeal decision. The appeal may be filed electronically: Beschwerde im Verwaltungsverfahren (Appeals in administrative proceedings).
If the administrative authority fails to make a decision
within 6 months, you have the option of filing a complaint before the
Regional Administrative Court regarding the delay. This must be filed with the defaulting authority. The complaint must specify that authority, set out a specific request and demonstrate that the authority’s time limit for making a decision has expired.